Reports returned by guilds outlining the work and achievements of the year. Organised by county and parish alphabetically and provincially.
Manuscript
3290 Archival description results for Manuscript
Reports returned by guilds outlining the work and achievements of the year. A second report was provided at the end of 1964 by guilds. Organised by county and parish alphabetically and provincially.
Reports returned by guilds outlining the work and achievements of the year. Organised by county and parish alphabetically and provincially.
Register of when guilds received first recognition, final recognition and when certificate was sent. Includes annual report synopsis from guilds.
Information relating to the running of the Builebaun Group Water Scheme; quote for water tank, timeline of events and costs of project.
Two copies of a black and white group photograph of the City Engineer's Baseball Team. O'Shaughnessy is wearing a suit and hat, and is standing in the back row.
Two copies of a black and white group photograph of the City Engineer's Baseball Team. O'Shaughnessy is wearing a suit and hat, and is standing in the back row.
Three reports carried out on behalf of Eamonn Beatty on groundwater movement on Inis Mór. They relate to an application for planning permission on a site at the lighthouse west of Oghil Fort.
The first report was carried out by Eugene P Daly of the Geological Survey of Ireland, and covers Geology, Hydrogeology and Groundwater Protection. It includes a geological map and chart (5 Feb 1991) 5pp;
The second report was prepared by Dr Richard Thorn, Acting Head of Department of Environmental Science at the Regional Technical College in Sligo, and was carried out after a failed planning application. It deals with the disposal of the domestic wastewaters on the site, and includes a map of the area, and a diagram of the proposed constructed percolation field. The report is undated, but was prepared following a site visit on 10 June 1991, 7pp;
The 3rd report is by Thomas P Farrell. The report is on a co-ordinate level survey carried out on 22 July 1991. It encloses 2 drawings showing points surveyed transposed on to the OS map scale, and concludes it is a low risk for water contamination. (30 Jul 1991) 4pp.
Records relating to design work by Joe Vaněk on the production of Grounded, written by George Brant and directed by Selina Cartmell, starring Clare Dunne. Produced at the Project Arts Centre 'Upstairs', Dublin, by Siren Productions. 7 - 12 September 2015
File includes pencil and ink drawings and sketches by Joe Vaněk for 'Space Upstairs' at Project Arts Centre, with dimensions of the space noted; printed plan of 'Space Upstairs' with transparency overlay with pencil annotation; assorted pencil and ink drawings by Vaněk of facets of the stage design; A1 size drawing of the stage plan and space for the Tiger Fringe Festival production of Grounded, drawn by Vaněk (24 Jul 2015); copy of drawings showing thrust stage, lighting rigs and tech (14 Jul 2015); Provision drawing of the stage and space (13 Jul 2015).